One partner from plan to delivery. Send your project and get a quote within 12 hours. Start a request+49 (0) 228 76383681[email protected]
LignoSupplyRequest a quote

Home / Products / Fire-rated doors / Developers and general contractors

For developers and general contractors

Door packages that pass inspection.

Hundreds of openings, one supplier. Rated and non-rated doors per unit type and floor, delivered when the framing and frames are ready.

  • Fixed price per unit type
  • Delivery in phases, packed by floor
  • Label and listing documentation for closeout

What you get

  • Door schedule check: every opening against code rating and listing
  • One price per unit type, so budgets per floor are clear
  • Factory machining to the hardware sets, fewer site modifications
  • Packing and labeling by building, floor and unit
  • Documentation per opening for the inspection and the owner's NFPA 80 records

Projects we support

  • Multifamily and build-to-rent: entry doors, interior doors, corridor and stair doors
  • Hotels: entry, connecting, bathroom and back-of-house doors
  • Senior living and student housing
  • Offices and mixed-use buildings

Code basics

The wall decides the door.

Wall where the opening sitsTypical door ratingUsual door type
Fire walls and fire barriers, 3 to 4 hours3 hoursSteel. Wood doors are not listed at 3 hours.
Fire barriers, 2 hours (incl. shafts, exit stairways, exit passageways)90 minutesMineral core wood door
Fire barriers, 1 hour: shafts, interior exit stairways, exit passageways60 minutesMineral core wood door
Other fire barriers, 1 hour45 minutesMineral or fire-rated composite core
Fire partitions: corridor walls, 1 or 0.5 hour20 minutes + smoke and draft (S)Particleboard or composite core, gasketed
Other fire partitions, 1 hour / 0.5 hour45 / 20 minutesDepends on rating
Smoke barriers, 1 hour20 minutes + smoke and draft (S)Gasketed, self-closing, latching
Exterior walls, 2 hours / 1 hour90 / 45 minutesInterior-grade wood doors are usually not used here

Based on IBC Table 716.1(2). Ratings, vision panel limits and exceptions vary by code edition and local amendment.

Full guide to US requirements

Questions

Frequently asked.

How do you keep doors on schedule with the site?

We plan production backwards from your floor-by-floor dates and confirm each batch before it is produced. See our scheduled production.

Who is responsible for inspection?

The installer and the owner. We supply listed, labeled doors with the documents; installation per NFPA 80 and the acceptance test are on site.

Can you supply frames and hardware as one package?

On request we quote the complete opening. Otherwise we coordinate with your frame and hardware suppliers so all parts match the listing.

Code summary for orientation, based on the International Building Code (IBC), NFPA 80, NFPA 105 and the 2010 ADA Standards. Requirements depend on the code edition your jurisdiction has adopted and on local amendments. The architect of record and the authority having jurisdiction (AHJ) decide for your project.

Related

Send us your door schedule.

Door schedule, hardware sets and elevations are enough. Answer within 12 hours, with every opening checked against the listing.

Daniel Helmut Pinger

Your contact: Daniel Helmut Pinger, Tischlermeister
+49 (0) 228 76383681 · [email protected]

B2B requests only. We reply within 12 hours on business days. Drawings can be sent as a reply to our confirmation email.

Thank you – your request is in. Check your inbox for the confirmation; reply to it with drawings or photos.